SBS&APP asphalt waterproof material
- $1.50 / >=500 square meters
- 500 square meters
- Weifang Choice-Link Trading Co., Ltd.
- Shandong, China
- Mr Colin Chen
Product Detail
thickness: | 2.0mm-5.0mm | model: | CLB-2020 |
brand: | Kun Teng | port: | Qingdao |
Types of: | roofing felt | Packaging Details: | use a tray and then roll it up with pe film |
payment terms: | L/C, Western Union, D/P, T/T | length: | 10M |
Certification: | ISO 9001-2008, CQC, CNAS, IAF, IQNET | Material: | Asphalt, PE film |
After-sales service: | On-site installation, on-site training, on-site inspection, others | weight: | 3.0kgsm-5.5kgsm |
usage: | waterproof | place of origin; place of origin: | Shandong China |
Supply capacity: | 10 million square meters per year | surface: | PE film, aluminum film, sand, schist, etc. |
Warranty: | 1 year | product: | SBS&APP asphalt waterproof material |
nervous: | 450N | design style: | contemporary |
Project solution ability: | Graphic design, 3D model design, overall project solution | application: | hotel |
SBS&APP asphalt waterproof material
Specification:
Width: 1m
Length/Roll: 7.5m/10m/15m or according to your needs.
Surface: PE film/grain/sand...
feature:
a) SBS modified bitumen waterproofing membrane is specially used for waterproofing materials in cold regions
b) APP is especially suitable for areas with high temperature and strong sunshine
SBS/APP modified bitumen waterproof membrane
c) Good impermeability, puncture resistance, interlayer resistance, resistance resistance, erosion resistance, mildew resistance, weather resistance and other properties
d) It has good tensile strength, elongation and dimensional stability, and can well adapt to the deformation and cracking of the substrate
Scope of application:
It is suitable for waterproofing and moisture-proofing of civil building roofs, underground, bridges, parking lots, pools, and tunnels, especially for buildings under high temperature. According to roofing engineering regulations, APP modified bitumen waterproofing membrane can be used in first-class civil buildings and industrial buildings with special waterproof requirements.
There are two methods in the application:
a) One method is the heating and melting method. Heat the membrane and the polyethylene film on the surface of the roofing slab to nearly melted (non-flowing) by heating and melting, and then completely bond the membrane to the roofing slab with an overlap of 5-10 cm.
b) Another method is the cold bonding method. Pour the cold adhesive evenly on the roof slab, and install the roll film so that it is completely adhered to the roof slab.
In the application, heating and melting method and cold bonding method can be used alternately according to requirements.
c) After construction, a comprehensive and careful inspection is required to ensure that there are no bubbles or shedding. To ensure waterproof life.
Construction requirements:
1. The base layer should be dry and clean. Do not work in rain or snow.
2. Do not work under strong wind (above level 5)
3. It is not suitable for construction below 5°C
4. In case of rain and snow during the construction process, protective measures must be taken for the laid membrane materials.
5. All workers should wear special uniforms during installation to ensure safety. Fire fighting equipment should be available.
put up:
The special formula for fire protection allows the membrane to be used directly with the primer. This application is named "Torched on application".
1. Base treatment: The base surface must be clean, solid, flat, dry, free of gravel, cracks and floating dust. For larger grooves, fill them with cement mortar and level them. Remove protrusions and remove dust. If working on the floor or sides, dewater.
2. Apply a primer before laying the film, and use a vacuum cleaner or a dust blower to remove the dust on the surface of the concrete base; then apply a waterproof DY primer as a whole (for dust consolidation and high adhesion).
3. Heating and melting: Place the film correctly, ignite the torch, and heat the film and the base completely. When the surface of the film is black and bright and there is a fusion layer, stick the film and press it into a firm and flat state. The film is cooled and the seam edges are sealed with a float.
4. Requirements for lap joints: lap joints should be less than 3 layers, and the joints should be "T"-shaped, avoiding 4 layers of lap joints. Longitudinal lap width 50-80mm, end lap 100mm
5. Press the film surface firmly with a roller to make it stick firmly.
Packing and shipping:
1. The film should be stored under dry and ventilated conditions.
2. Membranes of different types must be stacked separately.
If you are interested in our products, please click here to contact us anytime!
Related Products
-
Wholesale black construction paper 30 min or tar felt paper or Fieldro MHR 15 for construction
saturation: 100% Package preview: design style: modern After-sales service: Online technical support brand: Jianda Material: Pad paper and asphalt application: hotel thickness: 0,36 +/- 0,18 mm Project solution capabilities: graphic design standard: ASTM D226/ASTM D4869 Warranty: More than 5 years..... -
Camel brand asphalt roofing felt paper felt warehouse 3 years modern online technical support project overall solution
color: black weight: 18 lbs - 70 lbs brand: custom made model: roof felt Project Solution Capabilities: overall project solution feature: Thin and waterproof Warranty: 3 years Package: in the tray thickness: 0.6mm-1.2mm application: storehouse Packaging Details: Packed in rolls in pallets Material:.... -
ice and water shield or peel and stick synthetic underlay
feature: Anti-mildew, waterproof Origin: Shandong Province, China Product Thickness (inches): 6.5 - 17 million brand: Perfect port: Qingdao/Guangzhou port Supply capacity: 200,000 square meters per week type: Synthetic Underlayment, Synthetic model: synthetic underlayment Material: Polypropylene...... -
Construction Waterproof Fiberglass Facial Tissue Fiberglass Facial Tissue
Warranty: 1 year Softness: soft length: 300~700m/roll Project solution ability: Graphic design, 3D model design, overall project solution, cross-category integration, others Package preview: payment terms: L/C, T/T Origin: Hebei china design style: modern After-sales service: Online technical...... -
Villa Roofing Material Durable Wind Resistant Asphalt Tile
Origin: Tianjing, China Supply capacity: 250,000 square meters per month warranty period: 30 years payment terms: L/C, Western Union, T/T design style: modern size: 1000*333*5.2mm pack: 16pcs/bundle color: custom made Warranty: over 5 years type: roofing material port: Tianjin harbor application:...... -
Asphalt shingle roof laying linoleum waterproofing membrane
Supply capacity: 1000 rolls per day model: JD-WM-01 color: grey payment terms: L/C, Western Union, D/P, D/A, T/T, MoneyGram port: Ningbo, Shanghai width: 1M-1.2M Project solution ability: others After-sales service: Online technical support, on-site installation, on-site training, on-site...... -
China Famous Brand Asphalt Roofing Felt Construction Black Paper
port: Tianjin payment terms: L/C, T/T place of origin; place of origin: Hebei china Types of: bitumen saturated organic felt standard: ASTM D226, ASTM D4869 Project solution ability: other usage: Metro cold storage airport runway and viaduct Packaging Details: Packed in rolls on pallets thickness:.....